Recommended MOQ
150 pcs / model
150 pcs / model
35-50 days
10-15 days
Spec + QC + Packing list
Project BOM, hardware, and dimension requirements are checked before sample release.
Batch schedule can be aligned with installation timelines and site readiness.
In-line QC and pre-shipment inspection reduce delivery and acceptance risk.
Needs strict specification compliance and clear delivery milestones.
Needs drawing consistency, sample lock, and change-control traceability.
Drawing, BOM, and sample confirmation package before production release.
Sampling, production, and shipment milestones mapped to site timeline.
QC summary, packing list support, and shipment documents.
Share market, quantity, and target style.
Get model recommendation and quotation.
Sample confirmation and spec locking.
Bulk production, QC, and shipment.
Yes, project-specific dimensions and hardware are supported after engineering review.
Yes, phased production and shipment can be arranged based on your project timeline.